Winskill Renewal Project
- a new gymnasium and additional multi-purpose rooms
- expanded fitness area
- expanded natatorium with a 10-lane lap pool, leisure pool, four-lane teach pool, sauna, steam room, cold plunge, water slide, and hot tub
- expanded parking
The project also includes upgrades to Winskill Park, including the construction of new ball diamonds as well as a reforestation plan.
Winskill Renewal Project Site Update
Please see the latest image chronicling the progress from the construction site:Tuesday, October 14, 8 am
- a new gymnasium and additional multi-purpose rooms
- expanded fitness area
- expanded natatorium with a 10-lane lap pool, leisure pool, four-lane teach pool, sauna, steam room, cold plunge, water slide, and hot tub
- expanded parking
The project also includes upgrades to Winskill Park, including the construction of new ball diamonds as well as a reforestation plan.
Winskill Renewal Project Site Update
Please see the latest image chronicling the progress from the construction site:Tuesday, October 14, 8 am
-
CLOSED: This survey has concluded.
The City of Delta is replacing the Winskill Aquatic and Fitness Centre with a new facility expected to open in 2027. In this phase of the project, the community is invited to complete this form to provide input into the key features of the facility, where to locate the facility on the site, and what impacts the project may have. The form will take approximately 10 minutes to complete. Feedback will be collected between May 7 and June 16. The results will be used to inform the detailed design and will be shared with the public and with Council.
Share Winskill Renewal Project Feedback Form #1 on Facebook Share Winskill Renewal Project Feedback Form #1 on Twitter Share Winskill Renewal Project Feedback Form #1 on Linkedin Email Winskill Renewal Project Feedback Form #1 link -
CLOSED: This survey has concluded.
Anyone who is interested in providing feedback on the location but who does not want to complete the full feedback form can complete this short version which only includes the questions about the location.
Share Short Version - Questions about Location on Facebook Share Short Version - Questions about Location on Twitter Share Short Version - Questions about Location on Linkedin Email Short Version - Questions about Location link
Phase 2: Community Engagement Report
Phase 2: Detailed Design Drawings
Phase 2: Architectural Drawings
Phase 2: Fact Sheet
Background
-
Phase 2 Detailed Design Renderings (February 2025).pdf (10.6 MB) (pdf)
-
Field Layout and Reforestation (Post Phase 1)
-
2025.01 Winskill Reforestation Strategy.pdf (4.73 MB) (pdf)
-
Jan. 17 Council Report Winskill Reforestation Update.pdf (7.74 MB) (pdf)
-
Sept. 23 Council Report Winskill Renewal Project Park Design and Next Steps
-
Winskill Renewal Project - TMSP 4th Diamond Support Letter of 19 September 2024.pdf (70.9 KB) (pdf)
-
Fourth Diamond Support Letter - TABA - September 18_ 2024.pdf (139 KB) (pdf)
-
Winskill June 2024 Updated Trees Survey (1.25 MB) (pdf)
-
2020.12 Winskill 2nd Arborist Report (3.11 MB) (pdf)
-
2020.09 Winskill 1st Arborist Report (3.87 MB) (pdf)
-
-
Phase 1 Engagement Results
-
Phase 1 Engagement Materials
-
Phase 1 Neighbourhood Engagement
-
Phase 1 Council Reports
-
Winskill Aquatic and Fitness Centre Renewal Council Report (Mar. 11_ 2024)
-
Winskill Aquatic and Fitness Centre Council Report (May 6_ 2024)
-
Winskill Aquatic and Fitness Centre Council Report (July 17_ 2024)
-
Winskill Aquatic and Fitness Centre Council Report (September 10_ 2024)
-
Winskill Aquatic and Fitness Centre Council Report (October 9_ 2024)
-
Winskill Design and Community Engagement Council Report (December 2024) (13.5 MB) (pdf)
-
-
Phase 1 Translated Materials
-
Delta Friends of the Library - Winskill.pdf (136 KB) (pdf)
-
May 5 Council Report Winskill Project Update (50.4 MB) (pdf)
Project Lifecycle
-
Pre-Design (Jan - Jul 2024)
Winskill Renewal Project has finished this stageConfirm needs, and function for the facility, i.e. location of facility, size, what’s included, # of lanes, etc.
-
Phase 1: Preliminary Design (Jul - Oct 2024)
Winskill Renewal Project has finished this stageThis is where the architect starts to put all the pieces together and produces renderings. This may also be referred as preliminary design.
-
Phase 2: Detailed Design (Oct - April 2025)
Winskill Renewal Project has finished this stageThis is where we start to progress from basic renderings developing the detailed design. The end result is with detailed design. During this stage we often refer to design documents in various levels represented as a percentage, normally between 50%-90% for this phase.
-
Construction Documents (April - Jul 2025)
Winskill Renewal Project is currently at this stageThese are the detailed design documents, or blueprints that provides the explicit details for the necessary construction to occur and would be included in the various tenders that are issued.