7A Avenue Roadway Improvements (52 Street to 53 Street)

Share 7A Avenue Roadway Improvements (52 Street to 53 Street) on Facebook Share 7A Avenue Roadway Improvements (52 Street to 53 Street) on Twitter Share 7A Avenue Roadway Improvements (52 Street to 53 Street) on Linkedin Email 7A Avenue Roadway Improvements (52 Street to 53 Street) link

Consultation has concluded

A design has been developed for 7A Avenue Roadway Improvements between 52 Street and 53 Street. This project aims to enhance community's roads and improve safety for everyone.

The proposed improvements include:

  • Roadway widening
  • Concrete sidewalk (north side)
  • Asphalt paving
  • Street lighting
  • Drainage upgrades

For more information, please refer to the Presentation Drawing.

A Public Information Meeting with City staffs was held on September 26,2024 to discuss the proposed design with the community and the online consultation closed on October 11, 2024. The construction of the project is anticipated to take place from July to August 2025.

Consultation has concluded

A design has been developed for 7A Avenue Roadway Improvements between 52 Street and 53 Street. This project aims to enhance community's roads and improve safety for everyone.

The proposed improvements include:

  • Roadway widening
  • Concrete sidewalk (north side)
  • Asphalt paving
  • Street lighting
  • Drainage upgrades

For more information, please refer to the Presentation Drawing.

A Public Information Meeting with City staffs was held on September 26,2024 to discuss the proposed design with the community and the online consultation closed on October 11, 2024. The construction of the project is anticipated to take place from July to August 2025.

  • Take Survey
    Share 7A Avenue Roadway Improvements Feedback Form on Facebook Share 7A Avenue Roadway Improvements Feedback Form on Twitter Share 7A Avenue Roadway Improvements Feedback Form on Linkedin Email 7A Avenue Roadway Improvements Feedback Form link
Page last updated: 08 Jul 2025, 10:34 AM